Stevie: Difference between revisions
→Stevie: Recycled. |
|||
| Line 1: | Line 1: | ||
== Stevie == | == Stevie == | ||
Stevie is the first physical server that HelioHost purchased in July 2008. He ran CentOS 5 for eight years until November 2016 when he suffered a hard drive failure. After replacing the hard drive [https://en.wikipedia.org/wiki/VMware_ESXi VMware ESXi] was installed, and the virtual machine [[:Ricky|Ricky]] was created. Stevie has been empty since July 2023 when Ricky was powered off. Stevie was officially retired in August 2024 when he was powered off forever. RIP Stevie. | Stevie is the first physical server that HelioHost purchased in July 2008. He ran CentOS 5 for eight years until November 2016 when he suffered a hard drive failure. After replacing the hard drive [https://en.wikipedia.org/wiki/VMware_ESXi VMware ESXi] was installed, and the virtual machine [[:Ricky|Ricky]] was created. Stevie has been empty since July 2023 when Ricky was powered off. Stevie was officially retired in August 2024 when he was powered off forever. Stevie's physical remains were recycled in March 2026, but his spirit lives on in Stevie 2.0. RIP Stevie. | ||
Stevie 2.0 was purchased in February 2025 after a [https://donorbox.org/rebirth-of-stevie successful fundraiser]. He is now equipped with Dual Xeon Gold 6138 CPUs, 192 GB of memory, and runs [https://en.wikipedia.org/wiki/VMware_ESXi VMware ESXi]. | Stevie 2.0 was purchased in February 2025 after a [https://donorbox.org/rebirth-of-stevie successful fundraiser]. He is now equipped with Dual Xeon Gold 6138 CPUs, 192 GB of memory, and runs [https://en.wikipedia.org/wiki/VMware_ESXi VMware ESXi]. | ||
Latest revision as of 19:55, 23 March 2026
Stevie
Stevie is the first physical server that HelioHost purchased in July 2008. He ran CentOS 5 for eight years until November 2016 when he suffered a hard drive failure. After replacing the hard drive VMware ESXi was installed, and the virtual machine Ricky was created. Stevie has been empty since July 2023 when Ricky was powered off. Stevie was officially retired in August 2024 when he was powered off forever. Stevie's physical remains were recycled in March 2026, but his spirit lives on in Stevie 2.0. RIP Stevie.
Stevie 2.0 was purchased in February 2025 after a successful fundraiser. He is now equipped with Dual Xeon Gold 6138 CPUs, 192 GB of memory, and runs VMware ESXi.
This page was last edited on 23 March 2026, at 19:55.